Tunnel Business Magazine

AUG 2018

TBM: Tunnel Business Magazine is the market leader for North America. TBM is written for leading professionals in all aspects of tunneling and covers project stories, design elements, contracting strategies, legal issues, new technology and more.

Issue link: http://digital.tunnelingonline.com/i/1014911

Contents of this Issue

Navigation

Page 10 of 43

TUNNELINGONLINE.COM TBM: TUNNEL BUSINESS MAGAZINE // AUGUST 2018 B U S I N E S S B R I E F S Virginia DEQ Accepts Alexandria Tunnel Plan A joint plan prepared by Alexandria Renew Enterprises (AlexRenew) and the City of Alexandria outlining an approach to remediate a portion of Alexandria's sewer system built in the late 1800s was been accepted by the Virginia Department of Environmental Quality (DEQ), AlexRenew announced on July 2. The plan outlines the construction of infrastructure im- provements to remediate four outfalls in Alexandria that cur- rently discharge a mixture of rainwater and sewage into Alex- andria's rivers and streams during rain events. DEQ has issued a letter stating that the plan is compliant with the Virginia General Assembly legislation passed in April 2017 requiring that discharges from the four outfalls be remediated by July 1, 2025. The acceptance of the plan marks a major milestone in complying with the legislation. The plan's infrastructure includes construction of a deep tunnel system, approximately two miles long, and new sewer infrastructure to connect the tunnels to the existing sewer system. The plan also includes upgrades to AlexRenew's Wa- ter Resource Recovery Facility to pump and treat wastewater collected in the tunnels. Once completed, the new tunnel sys- tem will connect to the existing outfalls to prevent millions of gallons of sewage mixed with rainwater from reaching our rivers and streams. Instead of polluting waterways, the sew- age and rainwater mixture will be captured by the tunnel sys- tem and conveyed to AlexRenew's Water Resource Recovery Facility to be transformed into clean water and returned to the Potomac River. When the plan is complete, it is estimated to reduce the occurrence of discharges from approximately 60 to less than four times per year, on average. The significant re- duction in the frequency and volume of these discharges will achieve cleaner, healthier waterways by reducing the amount of bacteria, trash, and other pollutants that currently impact Hooffs Run, Hunting Creek, and the Potomac River. AlexRenew, in a partnership with the City of Alexandria, will lead the planning, design, and implementation of the plan to remediate the outfalls by 2025. AlexRenew has served Al- exandria and portions of Fairfax County for over 60 years, conveying and transforming used and dirty water into clean and safe water. AlexRenew's Water Resource Recovery Facil- ity is a vital component to the plan since all flows captured by the new infrastructure will be delivered to the facility for treatment. In order to accommodate the additional flows dur- ing rain events, AlexRenew will make significant upgrades to its existing debris and bacteria removal treatment processes. Additionally, in an effort to minimize impacts to the commu- nity, the plan proposes that the AlexRenew facility serve as the main construction point for the proposed tunnel system. AlexRenew's expertise in implementing large-scale treatment projects and its close partnership with the City of Alexandria will ensure that the plan is implemented by 2025. AlexRenew will be conducting an extensive outreach pro- gram to ensure that the community and regulatory stakehold- ers are kept informed as the design for the tunnel system kicks off and is developed.

Articles in this issue

Archives of this issue

view archives of Tunnel Business Magazine - AUG 2018